Free Online Gantt Chart Maker

Make a Gantt chart free online, no signup — enter each task with a numeric start day and a duration, and bars map your project schedule. Export PNG, PDF.

Create Your Gantt Chart Now — It's Free

Share or embed this tool

Free to use on your own website — WordPress, Wix, or any platform. Paste one line and it works instantly, resizing to fit.

What Is a Gantt Chart?

A Gantt chart displays project tasks as horizontal bars along a calendar timeline. Each bar spans from a task's start date to its end date, so the bar length directly represents duration. Tasks are stacked vertically, giving a bird's-eye view of who is doing what and when.

Developed by Henry Gantt in the 1910s, this chart type remains the industry standard for project scheduling. Key components include the task list on the left, horizontal duration bars, a time axis across the top, optional milestone markers, and color coding by phase or resource. Gantt charts make it easy to spot overlapping tasks, idle gaps, and critical-path bottlenecks at a glance.

What Data You Need for a Gantt Chart

Three columns: a task name, a numeric start day (day offset from the project start, e.g. 0 = day one), and a duration in days. The chart plots one horizontal bar per task on a numeric day axis (no calendar dates), and it shows the first 10 tasks. Example rows — Planning, 0, 5; Design, 5, 10; Development, 15, 20. If you leave duration blank, the tool estimates it from the start value.

When to Use a Gantt Chart

Use a Gantt chart whenever you need to plan, schedule, and communicate project timelines. Common applications include software sprint planning, construction project scheduling, event coordination, product launch roadmaps, and academic research timelines.

Gantt charts are essential in project management, engineering, and operations. They work best for 10-30 tasks; beyond that, group tasks into phases. Choose a Gantt chart over a simple timeline when task duration and parallelism matter. Choose a roadmap chart instead when you need a higher-level strategic view without precise dates. Color-code bars by team or status to add an extra dimension of information.

Where a Gantt Chart Works Best

Gantt Chart Example: 45-Day Software Sprint Plan

A small team blocks out a single release across five back-to-back phases. Each phase starts the day the previous one ends, so the start day of each task equals the running total of the durations before it — and any slip pushes everything after it.

Sample data: Planning (start 0, 5 days); Design (start 5, 10 days); Development (start 15, 20 days); Testing (start 35, 7 days); Launch (start 42, 3 days)

The schedule runs from day 0 to day 45. Development is the longest bar at 20 days — double the 10-day Design phase and four times the 5-day Planning phase — so it dominates the timeline: shortening it is the only way to pull the day-45 launch earlier.

How to Create a Gantt Chart Online

  1. Step 1: Open ChartLoad and select the Gantt Chart type from the chart picker on the main page
  2. Step 2: Enter task names in the first column, a numeric start day in the second (0 for the first day, then the day offset for each later task), and a duration in days in the third
  3. Step 3: ChartLoad draws one horizontal bar per task on a numeric day axis, positioning each bar at its start day and sizing it by its duration
  4. Step 4: Keep your list to 10 tasks or fewer, since only the first 10 are plotted — roll extra detail into summary phases
  5. Step 5: Click Export and download your Gantt chart as PNG, PDF, or SVG

Gantt Chart Best Practices & Tips

Common Gantt Chart Mistakes to Avoid

Frequently Asked Questions

Is this Gantt chart maker really free?

Yes — ChartLoad's Gantt chart maker is 100% free with no signup and no watermark. One practical limit to know: the chart plots the first 10 tasks, so group finer detail into 10 or fewer summary phases for a clean schedule.

How do I make a Gantt chart online?

Pick the Gantt chart type and enter one row per task with three values: the task name, a numeric start day (the day offset from the project start), and a duration in days. ChartLoad draws a horizontal bar for each task on a numeric day axis. Then export as PNG, PDF, or SVG.

Can I use real calendar dates like 2026-02-16?

Not directly — ChartLoad reads numeric values, not dates, and plots tasks on a plain day axis (the hover shows 'Start' and 'Duration' as numbers). To use a calendar, pick a project start date yourself, then enter each task's start as the number of days after that date and its length as a day count.

Can I show task dependencies or % complete?

No. The tool draws each task as a single solid bar from its start day for its duration — there are no dependency arrows, no critical-path automation, and no progress-fill / % complete shading. You can place tasks back-to-back manually by setting each start day to the running total of prior durations; for formal dependencies or progress tracking, use a dedicated project-management tool.

How many tasks can I chart?

Up to 10. The renderer plots the first 10 rows and ignores any beyond that, so keep your list to 10 or fewer phases — combine sub-tasks into summary bars if you have more.

Related Chart Types

Ready-Made Gantt Chart Templates

Skip the blank canvas — open a free, editable Gantt Chart template, swap in your own data, and export. Browse all templates.

Ready to Create Your Gantt Chart?

No signup. No watermark. 100% free.